Allied Contractors

Mechanical works completed

Sr. NoList of Projects CompletedYearClients
1High pressure pipeline construction work 55 km of 6" dia sch-80 lines 07 Nos Additional Wells OGDCL KPD-TAY Plant.2018OGDCL
2High Pressure Pipeline Construction Work - Fabrication & Installation of 32 KM Flow Line for OGDCL Bhitrism West 1A Well # 1 At Bobi Oil, District Sanghar, Sindh2017OGDCL
3High Pressure Pipeline Construction Work - Fabrication & installation of 8 KM flow line from OGDCL Resham well # 01 to Sinjhoro Plant, District Sanghar, Sindh2017OGDCL
4Services for Interconnecting Job of CP-1 & CP-2 at KFGCS 2015PPL
5Laying of New CS Gas Pipeline 6" Dia SCH - 40 at Niamat Basal 2015United Energy Pakistan
6Refurbishment of Cowling and Gear Boxes Base / Foundations of Cooling Towers of Banks at Sui Gas Field 2014PPL
7Overhauling and Maintenance of Well Test Separator at Kandhkot Gas Field 2014PPL
8Supply / Erection & Dismentling of Scaffolding at Mazarani Gas Field 2014PPL
9Services of Scaffolding Erection at Chachar Gas Field 2014PPL
10Fabrication and Welding of Nozzles of Condensate Flash Drum and Piping Work at Chachar Gas Field 2014PPL
11Services for Erection of Scaffolding in Process Area 2013PPL
12Installation of Cooling Tower and Water Circulating Pump at Kandhkot Field Gas Compression Station (KFGCS) 2013PPL
13Repairing and Overhauling Utility Valves at KFGCS 2013PPL
14Maintenance of Cooling Tower 1 at Kandkhot Gas Field Compression Station (KFGCS)2012Byco Petroleum Limited
15Services of Scaffolding Erection at Chachar Gas Field 2012PPL
16Services for Piping Works for Fire Water Sprinke System on LPG Storage Bullets. 2012PPL
17Major overhaul of Miller BB 600DX Mobile Welding Plant at Kandhkot Gas Field 2012PPL
18Repair and Maintenance of Jones Crane K-0014 at Kandhkot Gas Field 2012PPL
19Overhauling of PTO and Gear Assembly of Fire Tender (HINO JP - 8512) at Kandhkot Gas Field. 2012PPL
20Re-Coating of Exposed Portion of 10" Dia GGM Pipeline of Section 1 at Kandkhot Gas Field2012PPL
21Reparing of Fire tender Water Pump at Kandkhot Gas Field 2012PPL
22Miscellaneous Maintenance on Overhead Lines 2012PPL
23Fabrication of Shaft Sleeve for MEA Circulating Pump at PurificaTION Plant Sui Gas Field. 2011PPL
24Laying of New Domestic / Utility Water Piping Network Inside Camp Premises at Kandhkot Gas Field. 2011PPL
25Paiting OF 16" Dia Pipeline at GGM Section V & VII AT Kandhkot Gas Field. 2011PPL
26Installation of Inlet Gas Filter (02nos.), Suction Knowckout Drum (01no) and Discharge Knockout Drum (01no.) Complete with Fabrication of Connecting Piping, Valves; Fittings and Tie-in with Existing Piping at Chachar Gas Field, District Kashmore, Sindh. 2011PPL
27Dismantling & Removing of Gas Turbine Shed at Pumping Station No. 3 Shikarpur 2010PaK-Arab Refinery Limited
28Painting of Pipelines at GGM Section III, Kandhkot Gas Field District Kashmore2010PPL
29Painting of Pipelines at GGM and Feeder Lines in Kandhkot Gas Field District Kashmore. 2010PPL
30Painting of Pipelines at GGM Section II & Feeder Lines at Kandhkot Gas Field 2009PPL
31Construction Steel Infrastructure as per Drawing, Adjacent Cool Tower at FFBL 2009Shaheen Construction Company
32Providing & laying of 12" Dia MS Pipeline for Sweet Water at LDA Sector-1 Hawks bay Scheme 42, Karachi 2009Shaheen Construction Company
33Necessary Repairing & Painting of Pipeline Section VII (loop line) at Kandhkot Gas Field 2009PPL
34Providing & Apply of Paint on Pipeline at Kandhkot Gas field 2009PPL
35Repairing of Fire Tender at Kandhkot Gas Field 2009PPL
36Coating & Wrapping of 8" Dia Pipeline from Truck Loading 1 to Truck Loading 2. 2008National Refinery Limited
37Fabrication & Fixing of Stool at Mazarani Gas Field District Larkana 2008PPL
38Painting of Pipelines at Section V & Feeder Lines of Kandhkot-5 (U/M) & Kandhkot-17 (U/M) at Kandhkot Gas Field 2008PPL
39Refurbishment, Modification, Erection Works for Design & Construction Departments Mobile Porta Cabin Including Electrification Works 2008PPL
40Construction of Community Shed at West Wharf Depot. 2008PPL
41Providing & Apply of Paint on 16 Dia in GGM Sec-II(From Tie-in of Sec-1 to Buries Portion near Sona Village) 2008PPL
42Supply and Fabrication of SS Tank 2008PPL
43Supply & Fabrication of Mild Steel Tank 2008PPL
44Supply & Laying of 6 2007Public Sector Organization
45Replacement of 29 Nos Rusty Poles of SUP Old Colony and PRP area at Plant 2007Public Sector Organization
46Sand blasting & Painting of New Fabricated Unit of FFBL at Workshop Facility 2007Mass Industries
47Construction of Conditioning Chamber at Balochistan 2007Public Sector Organization
48Providing of Steel Plateform and Bridge at SSGC Gas Injection Point Miro Khan Road Larkana 2007PPL
49Providing and Installation of Iron Grill Over Room of Shaikh Goth Solar Panel Station 2007PPL
50Fabrication & Erection of Shed and Electrical Works at Tube Well no.2 (Renovation of tube well No.2) 2007PPL
51Inspection, Maintenance and Painting of Communication Tower 2007PPL
52Providing Utility Services on Daily Rental Basis (Water / Diesel Pumps & Generators) for Use at Gwadar Sea Port During Drilling of Pasni X-2 Offshore Well 2005PPL
53Providing Utility Services at Gwadar Port 2005PPL
54Providing & Laying of MS Line 8" Dia for 270 Tank to Tank No. 300 2004National Refinery Limited
55Replacement of Pipeline Section of Well-9 at Adhi Field 2004PPL
56Construction / Welding of Adhi Well-15, 6" NPS dia Feeder Line and Modification of Adhi Well Nos 11 Feeder Line2004PPL
57Laying of 12" Dia Pipeline with Necessary Civil Works at CCA Colony, Karachi 2004Mass Industries
58Installation of Directional Boards on Road No 50002004National Refinery Limited
59Laying of kill lines at Well Sites 2003PPL
60Installation & welding/Fabrication Services for Additional De-Ethaniser Overhead Compressor to be Installed at Adhi Gas Field 2003PPL
61Modification of 3" Dia Water Line at Mazarani Gas Field 2003PPL
62Fixing of Pipe Clamp on High Pressure Pipelines 2002PPL
63Laying of Kill Lines of Well Sites, Kandhkot Gas Field 2002PPL
64Laying & Welding of 4” MS Pipe Line in Camp area 2002PPL
65Changing of Surface Safety Valves, Kandhkot Gas Field. 2002PPL
66Installation & Welding of Foam Tank at DHP at Kandhkot Gas Field 2001PPL
67Installation of Foam Tank at Gas Dehydration Plant at Kandhkot Gas Field. 2001PPL
68Fabrication of Shed for Chemicals at Kandhkot Gas Field Store. 2000PPL
69Fabrication & Installation of Cellar Grating for Well nos.19,20,21& 22 Kandhkot Gas Field. 1999PPL
70Fabrication of Corrosion in Hobitor 1999PPL
71Fabrication of Gate & Meter Shed at Well 21 & 22 Kandhkot Gas Field 1999PPL
72Fabrication & Welding of Gas Accumulator New Arrangement for Gas SuPakistan Petroleum Limitedy from DHP to Gas Fire Generator 1999PPL
73Fabrication & Welding of Surface Fitting at Feeder Line Well # 21 Kandhkot Gas Field 1998PPL
74Fixing and Welding of 1 inch dia Clamps at GGM section IV Kandhkot Gas Field. 1998PPL
75Casting& Make up Bearing Adapter 1997PPL
76Fixing and welding of Clamps at 1 inch dia GGM section V & Section VI Kandhkot Gas Field. 1997PPL
77Fixing & Welding of Clamps on 16 inch Dia Gas Pipeline Sec V 1996PPL